Globe technical team will be having an activity between LHG-P1 and LHG-PE1. This activity aims to install network taps in between the links of LHG-PE1 and the PE routers connected to LHG-PE1 so it would be easier to analyze traffic passing thru the network that will give more stable link and reliable network. Impact of this activity is very minimal as this will only incur 50 milliseconds switch hits maximum.
Kindly see the activity details below.
Globe Scheduled Maintenance Advisory | |||||
Activity Name | Tapping points insertion between LHG-P1 and LHG-PE1 | ||||
Objective | To successfully insert tapping point between LHG-P1 and LHG-PE1 | ||||
Start Date and Time of Activity | April 2, 2017 | 0000H (Philippine Time) | ||||
End Date and Time of Activity | April 2, 2017 | 0500H (Philippine Time) | ||||
Service Impact | 50 milliseconds switch hits | ||||
Circuit/s Affected |
|
Tapping points insertion between LHG-P1 and LHG-PE1